Aaron Burdick joined E3 in 2019 and leads projects that solve technical, policy, and institutional challenges related to the clean energy transition. He leads many of E3’s largest electricity planning projects for utilities, system operators, and regional planners across North America, including overseeing E3’s long-term support for California’s IRP process. Aaron is also a key thought leader in E3’s integrated system planning practice, helping planners and the industry advance more holistic planning practices that integrate data, models, and processes across generation, transmission, distribution, and customer program planning. He has helped multiple utilities develop ISP strategies and analytical frameworks, and has also led past ESIG Integrated Planning task forces.

Before E3, Aaron worked at Pacific Gas & Electric, where he led the development of PG&E’s 2018 Integrated Resource Plan and provided leadership on decarbonization efforts and renewable energy strategy. Aaron also spent four years at energy consultancy ICF International and has provided strategic advice and energy analysis for multiple non-profit environmental organizations.

Outside of work, Aaron is an accomplished nature photographer, published poet, guitar/mandolin/piano player, and songwriter.

Education: MS, Civil and Environmental Engineering, Atmosphere and Energy, Stanford University; BS, Environmental Studies, University of California, Santa Barbara

Projects

Integrated Resource Plan | California Public Utilities Commission, 2023

E3 has provided comprehensive technical and advisory support to the Energy Division of the California Public Utilities Commission (CPUC) in its administration of the state’s IRP program, mandated by the passage of SB 350 in 2016.  E3 worked with CPUC staff to develop the structure of the IRP program including a three-year modeling cycle in which Staff prepares a system-wide plan that informs the California Independent System Operator (CAISO)’s annual Transmission Planning Process (TPP) and informs Load-Serving Entities integrated resource plans in alternate years.

E3 has helped the CPUC design an optimal “Preferred System Plan” for the combined utilities that incorporates the resource procurement plans of the LSEs and complies with the state’s clean energy policy requirements. In the 2022-2023 cycle, the policy requirements considered include a 60% RPS by 2030 and SB 100 by 2045, and a statewide greenhouse gas emissions target of 25 million metric tons (MMT) by 2035, while capturing the operational and reliability challenges encountered at high penetrations of variable renewable generation. As part of this process, E3 evaluated dozens of scenarios reflecting alternative assumptions about load forecasts and electrification, resource costs, the availability of offshore wind and out-of-state wind, the ability of end-use loads to operate flexibly, and a variety of other input parameters.

Integrated Resource Plan | California Public Utilities Commission, 2021

E3 has provided comprehensive technical and advisory support to the Energy Division of the California Public Utilities Commission (CPUC) in its administration of the state’s IRP program, mandated by the passage of SB 350 in 2016.  E3 worked with CPUC staff to develop the structure of the IRP program including a three-year modeling cycle in which Staff prepares a system-wide plan that informs the California Independent System Operator (CAISO)’s annual Transmission Planning Process (TPP) and informs Load-Serving Entities integrated resource plans in alternate years.

E3 has helped the CPUC design an optimal “Preferred System Plan” for the combined utilities that incorporates the resource procurement plans of the LSEs and complies with the state’s clean energy policy requirements. In the 2020-2021 cycle, the policy requirements considered include a 60% RPS by 2030 and SB 100 by 2045, and a statewide greenhouse gas emissions target of 38 million metric tons (MMT) by 2030, while capturing the operational and reliability challenges encountered at high penetrations of variable renewable generation. E3 also supported the Energy Division’s development of a mid-term reliability order requiring the procurement of 11.5 GW of effective capacity by 2026. As part of this process, E3 evaluated dozens of scenarios reflecting alternative assumptions about load forecasts and electrification, resource costs, the availability of offshore wind and out-of-state wind, the ability of end-use loads to operate flexibly, and a variety of other input parameters.

Net Zero Carbon Pathways Study | Omaha Public Power District, 2021

To support the development of its 2021 Integrated Resource Plan (IRP), Omaha Public Power District (OPPD) engaged E3 to perform a comprehensive study on various pathways for OPPD to achieve net zero carbon by 2050. With a goal of net zero carbon emissions by 2050, OPPD sought a study to understand different pathways to achieve their target emissions, reliability, costs, and generation. E3’s study consisted of three primary phases: multi-sector modeling using the E3 PATHWAYS model to develop multiple electricity sector demand forecasts; reliability and resiliency analysis using the E3 RECAP model; and portfolio optimization using the E3 RESOLVE model to develop cost-optimal electricity portfolios that achieved both net-zero carbon and target reliability by 2050. E3 found that OPPD can achieve net zero while balancing affordability and reliability and that all net zero pathways require a cessation of coal generation and reduced use of fossil generation. A mix of new low-carbon resources including renewable energy, energy storage, and community-wide energy efficiency will be required as well as firm capacity resources, which will be needed to maintain resource adequacy.