PROJECT PROFILE
Flexibility assessment for wind integration | Portland General Electric, 2014–15

Featured Image

After Oregon set renewable portfolio standard (RPS) goals of 25 percent by 2015 and 50 percent by 2040, Portland General Electric (PGE) turned to E3 to study the flexible generation capacity necessary to meet wind integration needs. Our studies considered the variability, uncertainty, and timing of renewable energy output, and we considered alternative resources such as flexible combined cycle gas turbine plants, frame and aero-derivative combustion turbines, reciprocating engines, and energy storage. Our analysis informed the resource procurement strategy in PGE’s 2016 integrated resource plan. The studies found that PGE’s need for within-hour operational flexibility is not a significant driver of the value or need for new gas resources, even at a 50 percent RPS.